Safety & operation

What WA law requires before you operate hired plant, what we give you with every hire, and where to get licences, plans and training.

Our side

What we provide with every hire

Pre-hire inspection

Every machine is checked and serviced before it leaves the yard.

Operating briefing

Our team walks you through controls and safety checks at collection.

Operating briefs, manuals & safe operation sheets
A safe operation sheet with every hire, plus the manufacturer’s manual where the machine comes with one.
PPE guidance

Minimum PPE shown on every product page with our safety icons.

Before You Dig Australia

Check before you dig

The service began in WA as Perth One Call in 1987. Lodging an enquiry is free, however small the job.

1

Lodge an enquiry
At byda.com.au, at least one business day before work starts.

2

Wait for responses
Every affected asset owner sends plans. A response isn’t approval to dig.

3

Locate and pothole
Confirm cable and pipe positions by hand or vacuum before machine digging.

4

Dig with care

Strike something? Stop, keep clear and call the asset owner.

Western Power

Overhead powerlines

Booms, excavator arms, tipper trays and loads must stay outside the danger zone around live lines. Its size depends on voltage.
Hirer covers it

Plan first. Find line locations and voltage before plant arrives.

Use a spotter whenever plant could reach the zone.

Tiger tails don’t insulate. They only make low-voltage lines easier to see.

Request an isolation from Western Power if the work must enter the zone.

It’s an offence to enter the zone under the WHS (General) Regulations 2022.

Health hazards

Dust, noise and fumes

Silica dust

Cutting concrete, brick or stone dry without extraction is non-compliant in WA. Hire wet saws or on-tool extraction, and wear a respirator.

Noise

Jackhammers, saws and compactors need hearing protection. Check the product page.

Engine exhaust

Never run petrol or diesel engines indoors or in trenches. Carbon monoxide builds fast.

On every product page

Reading our PPE icons

Five core icons show the minimum PPE. Some products add extras such as hearing or fall-arrest protection. Low-risk items like barbecues show none.

Hard hat
Steel cap boots
Hi-vis vest
Safety glasses
Safety gloves
Proud member of the industry's safety bodies
hria-proud-member-logo
ewpa-proud-member-logo
From Faq Hub

Safety questions

Yes. Our team gives an operating briefing when you collect. Ask if you’re unsure about anything.

Each product page lists the minimum PPE. Most plant needs safety boots, hi-vis, gloves and eye protection; some needs hearing or respiratory protection.

Not without dust control. In WA, uncontrolled dry cutting of silica materials is non-compliant. Use wet cutting or on-tool extraction, plus a suitable respirator.

No. Exhaust contains carbon monoxide. Run engines outdoors with good ventilation.

Yes. Lodge a free Before You Dig Australia enquiry at byda.com.au before any excavation, however small.

At least one business day before work starts. Wait for responses from all affected asset owners.

No. Responses are plans and information, not approval to excavate. Use them to locate assets, then pothole carefully.

Stop work, keep people clear and contact the asset owner on the number in your BYDA confirmation. You may be liable for the damage.

Plant, loads and people must stay outside Western Power’s danger zone, which depends on voltage. Check Western Power’s guidance or request an isolation.

Guides

Related Articles

It seems we can’t find what you’re looking for.
Scroll to Top

Enquire To Hire